Estimates of a water supply project depends upon the rate of water supply per capita consumption and probable population estimated at the end of the design period of

15 views
  • 5 to 10 years
  • 10 to 15 years
  • 15 to 20 years
  • 20 to 30 years (Correct Answer)

Explanation

Estimates of a water supply project depend on several factors, including the rate of water supply, per capita consumption, and probable population estimated at the end of the design period.

The design period is the period for which the water supply project is designed to meet the future demand. The length of the design period depends on the expected life of the system and the growth rate of the population.

In general, the design period for a water supply project can range from 5 to 30 years or more. Based on the options given, the most appropriate answer would be:

For a design period of 5 to 10 years or 10 to 15 years, the probable population estimated at the end of the design period would be relatively lower, and hence the estimates of the water supply project would also be lower.
For a design period of 20 to 30 years or 25 years, the probable population estimated at the end of the design period would be relatively higher, and hence the estimates of the water supply project would also be higher.
Therefore, based on the options given, the most appropriate answer would be 20 to 30 years or 25 years.