Bench curing is required for:
52 views
- Equalization of pressures throughout the mold
- uniform dispersion of monomer
- Better bond of resin teeth with base materials
- All of above (Correct Answer)
Explanation
Bench curing is done for 30-60 min at room temperature after final closure of pat-king.
Expre dough removed during packing and closure Is
culled flash.