A clay layer drained at both top and bottom takes 2 years to reach 50% consolidation. If the same layer were drained only at the top, how long would it take to reach the same degree of consolidation?

6 views
  • 4 years
  • 8 years (Correct Answer)
  • 16 years
  • 1 year

Explanation

From t = Tv·d²/cv, time is proportional to the square of the drainage path. With single drainage the drainage path doubles, so the time becomes 2² × 2 = 8 years.

Comments (0)

No comments yet. Be the first to comment!

Want to practice more?

Explore thousands of MCQs across every exam category on Exams Nepal.

Find More MCQs